THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 5/17/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, AND STAGE 1 REDUCED MONITORING SCHEDULE (2007). ADEQ DID NOT NOTIFY THE PWS OF THE APPROVAL AND CHANGE IN MONITORING FREQUENCY (FROM TRIENNIAL UNDER STAGE 1 TO ANNUAL UNDER STAGE 2) UNTIL 2016. AS A RESULT, NO VIOLATION WILL BE ASSESSED FOR FAILING TO MONITOR IN 2014 AND THE STAGE 2 MONITORING SCHEDULE WILL BEGIN IN 2015. THE SAMPLE COLLECTED DURING AUGUST 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A OUTSIDE FAUCET DUAL (TTHM & HAA5)
|