ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0413096

Federal Type:

C

Water System Name:

THE ORME SCHOOL

Primary Source:

GW

Principal County Served:

YAVAPAI

System Status:

A - MAP

Comments:

Activity Date:

06-01-1977




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 5/19/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2011. THE SAMPLE COLLECTED DURING AUGUST 2014 (WITH THE RESAMPLE OF HAA5 IN SEPTEMBER) (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A CRAVER HOUSE DUAL (TTHM & HAA5) 02-A RUSH HOUSE DUAL (TTHM & HAA5) THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET (WITH EDITS FROM ORIGINAL SUBMITTAL) WAS APPROVED ON 5/21/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014 AND 2015. SAMPLES COLLECTED IN AUGUST 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM FOR THE FIRST TRIENNIAL MONITORING PERIOD (2015-2017). BEGINNING IN 2015, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED TRIENNIALLY, AT ONE LOCATION (02-A), DURING THE MONTH OF AUGUST. THE SAMPLE MUST BE COLLECTED EVERY THREE YEARS WITH THE NEXT SAMPLE DUE IN 2018 (THEN IN 2021, 2024, ETC.). PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 02-A RUSH HOUSE DUAL (TTHM & HAA5)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013