THE STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 6/21/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2008-2013 AND STAGE 1 SAMPLING SCHEDULE, AND 40/30 CERTIFICATION APPROVED IN 2012. STAGE 2 SAMPLES COLLECTED PRIOR TO THIS APPROVAL DURING 2014 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF JUNE.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 2013 SHOSHONE DRIVE DUAL (TTHM & HAA5)
02-A 306 LOBO DUAL (TTHM & HAA5)
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 6/21/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF AN INDIVIDUAL SAMPLE SET (TTHM OR HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF JUNE.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 2013 SHOSHONE DRIVE INDIVIDUAL (TTHM)
02-A 306 LOBO INDIVIDUAL (HAA5)
|