THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/25/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED 5/14/09), AND STAGE 1 REDUCED MONITORING SCHEDULE. THIS SYSTEM DID NOT MEET THE REQUIREMENTS TO CONTINUE ON REDUCED MONITORING FROM STAGE 1 TO STAGE 2; HOWEVER, ADEQ DID NOT NOTIFY THE PWS OF THE APPROVAL AND CHANGE IN MONITORING FREQUENCY (FROM TRIENNIAL UNDER STAGE 1 TO ANNUAL UNDER STAGE 2) UNTIL 2016. AS A RESULT, NO VIOLATION WILL BE ASSESSED FOR FAILING TO MONITOR IN 2015 AND THE STAGE 2 MONITORING SCHEDULE WILL BEGIN IN 2016. THE SAMPLE COLLECTED DURING AUGUST 2014 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ROUNDUP DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ROUNDUP (AKA TWIN LEAF) DUAL (TTHM & HAA5)
02-A 3489 ABERDOVEY DUAL (TTHM & HAA5)
|