THE STAGE 2 REDUCED MONITORING SUMMARY SHEET AND MAP WERE APPROVED ON 05/25/2016. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 REDUCED MONITORING (GRANTED 04/20/2006), AND THE 40/30 CERTIFICATION (GRANTED 11/30/2007). STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING JULY (WITH RESAMPLES IN AUGUST) 2014 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 1100 E TREATMENT PLANT DR. DUAL (TTHM & HAA5)
02-A 8466 E LONG MESA DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 1100 E TREATMENT PLANT DR. DUAL (TTHM & HAA5)
02-A 8434 E LONG MESA DUAL (TTHM & HAA5)
|