THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 5/19/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 40/30 CERTIFICATION (GRANTED BY DEFAULT APRIL 2009), AND STAGE 1 SAMPLING SCHEDULES. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 (WITH SEPTEMBER RESAMPLES OF HAA5S) & AUGUST 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
|