THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAPS WERE APPROVED ON 5/19/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2006-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED 7/2/09) AND STAGE 1 REDUCED MONITORING SAMPLING SCHEDULE (APPROVED 7/2/09 FOR TRIENNIAL, AND THEN THE FREQUENCY WAS ADJUSTED TO ANNUAL WHEN THE SYSTEM CROSSED THE 10,000 THRESHOLD). STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 AND SEPTEMBER 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
IN 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 1711 ASPEN ST. DUAL (TTHM & HAA5)
02-A 230 E. HWY 89 A DUAL (TTHM & HAA5)
|