THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (CMP) SUMMARY SHEET, STAGE 2 REDUCED CMP SUMMARY SHEET AND MAP WERE APPROVED ON 06/23/2016. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 SAMPLING SCHEDULES AND STAGE 2 MONITORING RESULTS FOR 2014 AND 2015. THE SAMPLE COLLECTED DURING 2014 AND 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. THE SYSTEM HAS BEEN APPROVED TO TRANSITION FROM ROUTINE MONITORING 2RT/YR UNDER STAGE 2 (10/01/2013 ¿ 12/31/2015) TO REDUCED MONITORING 1RT/YR UNDER STAGE 2 STARTING 01/01/2016.
FROM 10/01/2013 TO 12/31/2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A LOT 1616 DUAL (TTHM & HAA5)
02-A LOT 2132 DUAL (TTHM & HAA5)
|