THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (WITH EDITS FROM ORIGINAL SUBMITTAL) WAS APPROVED ON 07/12/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2008-2013.
IN 2014 AND 2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT THREE LOCATIONS (01-A, 02-A AND 03-A), DURING THE MONTH OF JULY, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A LAWLER TERRACE DUAL (TTHM & HAA5)
02-A LOS GATOS DUAL (TTHM & HAA5)
03-A BRONSON DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 40320 HWY 96 DUAL (TTHM & HAA5)
02-A 222 MESQUITE DUAL (TTHM & HAA5)
|