THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET, AND MAP WERE APPROVED ON 8/1/16. APPROVAL WAS BASED UPON REVIEW OF THE COMPLIANCE MONITORING PLAN, STAGE 1 DATA AND MAP. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN 2014, 2015 AND 2016 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 2 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (03-A, 04-A), DURING THE MONTH OF SEPTEMBER.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
03-A 31 GARDEN DUAL (TTHM & HAA5)
04-A 513 VALLE VERDE PL DUAL (TTHM & HAA5)
IN 2015, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 4 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT FOUR LOCATIONS (01-A, 02-A, 03-A, 04-A), DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 104 CAMINO DON GUILLERMO DUAL (TTHM & HAA5)
02-A 55 BODEGA DR DUAL (TTHM & HAA5)
03-A 31 GARDEN DUAL (TTHM & HAA5)
04-A 513 VALLE VERDE PL DUAL (TTHM & HAA5)
IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 2 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A, 04-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 104 CAMINO DON GUILLERMO DUAL (TTHM & HAA5)
04-A 513 VALLE VERDE PL DUAL (TTHM & HAA5)
IN 2017, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 2 DUAL SAM
|