ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0412009

Federal Type:

C

Water System Name:

VALLE VERDE WATER COMPANY - EAST

Primary Source:

GW

Principal County Served:

SANTA CRUZ

System Status:

A - MAP

Comments:

Activity Date:

05-01-1955




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET, AND MAP WERE APPROVED ON 8/1/16. APPROVAL WAS BASED UPON REVIEW OF THE COMPLIANCE MONITORING PLAN, STAGE 1 DATA AND MAP. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN 2014, 2015 AND 2016 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. IN 2014, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 2 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (03-A, 04-A), DURING THE MONTH OF SEPTEMBER. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 03-A 31 GARDEN DUAL (TTHM & HAA5) 04-A 513 VALLE VERDE PL DUAL (TTHM & HAA5) IN 2015, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 4 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT FOUR LOCATIONS (01-A, 02-A, 03-A, 04-A), DURING THE MONTH OF AUGUST. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A 104 CAMINO DON GUILLERMO DUAL (TTHM & HAA5) 02-A 55 BODEGA DR DUAL (TTHM & HAA5) 03-A 31 GARDEN DUAL (TTHM & HAA5) 04-A 513 VALLE VERDE PL DUAL (TTHM & HAA5) IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 2 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A, 04-A), DURING THE MONTH OF JULY. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A 104 CAMINO DON GUILLERMO DUAL (TTHM & HAA5) 04-A 513 VALLE VERDE PL DUAL (TTHM & HAA5) IN 2017, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 2 DUAL SAM


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013
03-A DS001 Y 10-01-2013
04-A DS001 Y 10-01-2013