THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/28/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013. STAGE 1 SAMPLING SCHEDULE. STAGE 2 DATA WILL BE CREDITED TO THE SYSTEM FOR SAMPLES COLLECTED IN 2014, 2015, AND 2016.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ZONE A- 151 CASTELLO DR. DUAL
BEGINNING IN 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ZONE A- 151 CASTELLO DR DUAL
02-A ZONE B- 431 SANTA RITA DUAL
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF JULY.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ZONE A- 151 CASTELLO DR DUAL
BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ZONE A- 151 CASTELLO DR DUAL
02-A ZONE B- 431 SANTA RITA DUAL
|