THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN CMP SUMMARY SHEET (REVISED) AND MAPS WERE APPROVED ON 07/28/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FOR 2012 AND 2013. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 AND AUGUST 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
FROM 10/10/2013 TO 12/31/2015, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT LOT 119 DURING THE MONTH OF AUGUST.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF SEPTEMBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A LOT 318 DUAL (TTHM & HAA5)
|