THE STAGE 2 ROUTINE SUMMARY SHEET (WITH EDITS) AND MAP WERE APPROVED ON 6/13/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S COMPLIANCE MONITORING PLAN, SUMMARY SHEET, AND MAP. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 & AUGUST 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014 AND 2015, STAGE 2 ROUTINE MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATION (01-A, 02-A), DURING THE MONTH OF AUGUST.
BEGINNING IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF A 1 INDIVIDUAL TTHM SAMPLE AT SITE 01-A AND 1 INDIVIDUAL HAA5 SAMPLE AT SITE 02-A, COLLECTED ANNUALLY DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 5842 E SKY DIVE WAY INDIVIDUAL (TTHM ONLY)
02-A 4253 S PARACHUTE DRIVE INDIVIDUAL (HAA5 ONLY)
|