THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 07/14/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 REDUCED MONITORING (GRANTED 06/23/09), AND 40/30 CERTIFICATION (GRANTED 06/23/09). THE SAMPLE COLLECTED DURING JULY 2014 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. 2015 SAMPLE WAS NOT COLLECTED.
FOR 2014, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY.
FOR 2016, STAGE 2 MONITORING CONSISTS OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF APRIL.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A BROWNING DUAL (TTHM & HAA5)
02-A MEADOWS UNIT DUAL (TTHM & HAA5)
|