THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (CMP), CMP SUMMARY SHEET AND MAP WERE APPROVED ON 06/27/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013 AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 AND AUGUST 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
FROM 10/01/2013 ¿ 12/31/2015, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 03-A), DURING THE MONTH OF AUGUST.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 14620 N. RUSSEL RD. DUAL (TTHM & HAA5)
02-A 34407 W. SIESTA DUAL (TTHM & HAA5)
03-A 4825 N. PALA RD. DUAL (TTHM & HAA5)
|