THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN, COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 9/22/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2016 THAT WERE BELOW HALF THE MCL FOR TTHM (0.040 MG/L) AND HAA5(0.030 MG/L), AS WELL AS THE SYSTEM¿S POPULATION SIZE.
BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY.
THE NEXT SAMPLE IS DUE TO BE TAKEN IN JULY 2019.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A OFFICE DUAL (TTHM & HAA5)
|