THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 09/02/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013. STAGE 1 SAMPLING SCHEDULE. STAGE 2 DATA WILL BE CREDITED TO THE SYSTEM FOR SAMPLES COLLECTED IN 2014 AND 2015.
BEGINNING IN 2014 STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 4121 COLT DR. DUAL
|