THE STAGE 2 REDUCED MONITORING SUMMARY SHEET AND MAP WERE APPROVED ON 06/10/16. THE APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, AND STAGE 1 DBP REDUCED MONITORING. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014, MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE, COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST, BEGINNING IN 2014. YOUR NEXT SAMPLE SHOULD BE TAKEN IN AUGUST 2017. IF THE SYSTEM¿S POPULATION INCREASES TO SERVE 500 PEOPLE OR MORE, THEN THE MONITORING FREQUENCY WOULD AUTOMATICALLY MOVE FROM TRIENNIAL TO ANNUAL MONITORING.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH BOTH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A BUILDING 6 KITCHENETTE DUAL (TTHM & HAA5)
|