ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0402076

Federal Type:

NTNC

Water System Name:

DOUBLE ADOBE SCHOOL

Primary Source:

GW

Principal County Served:

COCHISE

System Status:

A - MAP

Comments:

Activity Date:

06-01-1977




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 7/22/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2006-2012, COMPLIANCE MONITORING PLAN, AND THE COMPLIANCE MONITORING PLAN SUMMARY SHEET. NO DATA WAS SUBMITTED FOR STAGE 2 DURING 2014 AND 2015. BEGINNING IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF SEPTEMBER. THE NEXT SAMPLES ARE DUE TO BE TAKEN IN SEPTEMBER 2016. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A KITCHEN DUAL (TTHM & HAA5)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013