CHANGED TO A GRADE 4 WITH POPULATION COUNT. VA
SET UP DEFAULT PLAN AND SCHEDULE, UNTIL SYSTEM SUBMITS THEIR INFORMATION.
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET, AND MAP WERE APPROVED ON 06/21/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S COMPLIANCE MONITORING PLAN SUMMARY SHEET, AND STAGE 1 DATA. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN AUGUST 2014 THROUGH AUGUST 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
FOR 2015 NO STAGE 2 DATA WAS SUBMITTED. THE SYSTEM WILL NOT RECEIVE A VIOLATION FOR MISSED MONITORING.
BEGINNING IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
YOUR NEXT SAMPLE SHOULD BE TAKEN IN AUGUST OF 2016.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 4952 WEST WARREN DRIVE DUAL (TTHM & HAA5)
|