ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0411078

Federal Type:

NTNC

Water System Name:

RESOLUTION COPPER COMPANY

Primary Source:

GW

Principal County Served:

PINAL

System Status:

A - MAP

Comments:

Activity Date:

06-01-1977




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 12-31-2015 10-01-2013 Y
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 6/17/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2007-2013, AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. IN 2014-2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF AUGUST. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A #9 UPSTAIRS RESTROOM DUAL (TTHM & HAA5) BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF INDIVDUAL SAMPLE SETS (TTHM OR HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A BUILDING 9 UPSTAIRS RESTROOM INDIVIDUAL (TTHM ONLY) 02-A E&M BUILDING INDIVIDUAL (HAA5 ONLY)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013 12-31-2015
02-A DS001 Y 10-01-2013 12-31-2015