THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (CMP) SUMMARY SHEET, STAGE 2 REDUCED CMP SUMMARY SHEET AND MAP WERE APPROVED ON 06/29/2016. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 SAMPLING SCHEDULE AND STAGE 2 MONITORING RESULTS FOR 2014 AND 2015. THE SAMPLE COLLECTED DURING SEPT. 2014 AND SEPT. 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. THE SYSTEM HAS BEEN APPROVED TO TRANSITION FROM ROUTINE MONITORING 1RT/YR UNDER STAGE 2 (10/01/2013 ¿ 12/31/2015) TO REDUCED MONITORING 1RT/3YR UNDER STAGE 2 STARTING 01/01/2016.
FROM 10/01/2013 TO 12/31/2015, STAGE 2 ROUTINE MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF SEPTEMBER.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
YOUR SYSTEM NEEDS ONE DUAL SAMPLE SET (TTHM & HAA5) TO BE TAKEN IN AUGUST 2018 AND EVERY THREE YEARS AFTERWARDS (AUGUST 2021, AUGUST 2024, AUGUST 2027, ETC.).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SPACE 33 DUAL (TTHM & HAA5)
|