THE STAGE 2 REDUCED SUMMARY SHEET AND MAP WERE APPROVED ON 7/5/2016. APPROVAL WAS BASED ON STAGE 2 SAMPLING.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF INDIVIDUAL SAMPLE (TTHM & HAA5), COLLECTED TRIANNUALLY, AT TWO LOCATION (01-A), DURING THE MONTH OF JULY. NEXT SAMPLE IS DUE TO BE TAKEN IN 2018.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A BACKFLOW VALVE SITE 1 HAA5 INDIVIDUAL
02-A HANNA RD SITE 2 TTHM INDIVIDUAL
|