ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0411037

Federal Type:

C

Water System Name:

ARIZONA TRAINING PROGRAM

Primary Source:

GW

Principal County Served:

PINAL

System Status:

A

Comments:

Activity Date:

03-01-1978




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 ROUTINE COMPLIANCE MONITORING SUMMARY SHEET (WITH EDITS FROM ORIGINAL SUBMITTAL) AND MAP (WITH EDITS FROM ORIGINAL SUBMITTAL) WAS APPROVED ON 07/22/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2007-2013. IN 2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED QUARTERLY, AT MULTIPLE LOCATIONS (01-A AND 02-A), DURING THE MONTHS OF FEBRUARY, APRIL, JULY, AND OCTOBER AT: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A 20 SANDSTONE CT DUAL (TTHM & HAA5) 01-A 50 SANDSTONE CT DUAL (TTHM & HAA5) 01-A 30 SANDSTONE CT DUAL (TTHM & HAA5) 02-A 50 OASIS CT DUAL (TTHM & HAA5) 02-A 30 OASIS CT DUAL (TTHM & HAA5) BEGINNING IN 3RD QUARTER 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED QUARTERLY, AT TWO LOCATIONS (01-B AND 02-B), DURING THE MONTH OF JULY, (FOLLOWED BY OCTOBER, JANUARY, ETC.) AT: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-B 30 OASIS CT DUAL (TTHM & HAA5) 02-B 50 SANDSTONE CT DUAL (TTHM & HAA5)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
01-B DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013
02-B DS001 Y 10-01-2013