THE STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 6/13/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004, 2006, 2007, 2008, 2009, 2010, 2012, AND 2013 AND INCLUDES EDITS TO THE ATTACHED COMPLIANCE MONITORING PLAN HIGHLIGHTED IN YELLOW.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 135 HAMMOND DUAL (TTHM & HAA5)
02-A 203 GREENWICH DUAL (TTHM & HAA5)
BEGINNING IN 2022, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-B AND 02-B), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-B 434 HARTFORD DUAL (TTHM & HAA5)
02-B 304 ESSEX DUAL (TTHM & HAA5)
|