THE STAGE 2 REDUCED SUMMARY SHEETS AND MAP (01-A SITE AND 02-A SITE) WERE APPROVED ON 6/8/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, 40/30 CERTIFICATION APPROVED ON 4/22/2009, AND STAGE 1 SAMPLING SCHEDULES. STAGE 2 SAMPLES COLLECTED DURING 2014 AND 2015 MEET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 MONITORING (FOR 2014 AND 2015) WILL CONSIST OF DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF SEPTEMBER.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SAMPLE STATION #108 DUAL
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF INDIVIDUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A STA #108 CROOK LN. INDIVIDUAL TTHM
02-A STA #105 COTTONMOUTH INDIVIDUAL
|