THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN, SUMMARY SHEET, AND MAP WERE APPROVED ON 06/08/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S 40/30, COMPLIANCE MONITORING PLAN, COMPLIANCE MONITORING PLAN SUMMARY SHEET, STAGE 1 DATA AND MAP. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 REDUCED MONITORING WILL CONSIST OF 2 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A, 02-A), DURING THE MONTH OF JUNE.
***SYSTEM CHOSE TO DO MORE SAMPLES THAN REQUIRED, SAMPLING IS NOW EQUIVALENT TO ROUTINE MONITORING. THE SYSTEM MUST ASK IF THEY WOULD LIKE TO REDUCE NUMBER OF SAMPLE TAKEN***
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ABREGO DRIVE & CALLE ASTORGA DUAL (TTHM & HAA5)
02-A TIGER PLACE DUAL (TTHM & HAA5)
|