THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN WAS APPROVED ON 07/14/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2005, 2007, 2009, 2012-2013.
IN 2014 AND 2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A TRAINING CENTER DUAL (TTHM & HAA5)
02-A WAREHOUSE DUAL (TTHM & HAA5)
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 07/14/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014 AND 2015.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A TRAINING CENTER DUAL (TTHM & HAA5)
|