THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAPS WERE APPROVED ON 5/23/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2006-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED 8/22/2007) AND STAGE 1 REDUCED MONITORING SAMPLING SCHEDULE (APPROVED 6/22/2006 FOR TRIENNIAL).
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF TWO INDIVIDUAL SAMPLE SETS ( 1 TTHM & 1 HAA5), COLLECTED TRIANNUALLY, AT TWO LOCATIONS (01-A, 02-A), DURING THE MONTH OF AUGUST FOR TTHM AND JULY FOR HAA5.
|