THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (WITH EDITS FROM ORIGINAL SUBMITTAL) WAS APPROVED ON 07/06/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2007-2013.
IN 2014 AND 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 17920 AVENIDA DE AUGUSTO DUAL (TTHM & HAA5)
02-A 661 CALLE DE SEPTIEMBRE DUAL (TTHM & HAA5)
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 07/06/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014 AND 2015.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST. THE SAMPLE MUST BE COLLECTED EVERY THREE YEARS WITH THE NEXT SAMPLE DUE IN 2018 (THEN IN 2021, 2024, ETC.).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 17920 AVENIDA DE AUGUSTO DUAL (TTHM & HAA5)
|