THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/1/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013 AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED PRIOR TO THE APPROVAL WILL BE CREDITED TO THE SYSTEM FOR 2015.
BEGINNING IN 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES (TTHM AND HAA5), COLLECTED ANNUALLY, AT TWO LOCATION (01-A AND 02-A), DURING THE MONTH OF OCTOBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A VALVE HOUSE DUAL
02-A SCHOOL DUAL
|