THE STAGE 2 REDUCED SUMMARY SHEET AND MAP WERE APPROVED ON 5/27/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, VSSW, AND STAGE 1 SAMPLING SCHEDULES. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 & AUGUST 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014 THROUGH 2015, STAGE 2 ROUTINE MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
THE NEXT SAMPLE IS DUE TO BE TAKEN IN AUGUST 2018.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A SAMPLE STA: #23 (TWIN PEAKS) DUAL (TTHM & HAA5)
|