THE STAGE 2 ROUTINE SUMMARY SHEETS AND MAP (EDITED TO CORRECT 01-A SITE AND 02-A SITE) WERE APPROVED ON 6/2/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, 40/30 CERTIFICATION (APPROVED ON 07/21/2008), AND STAGE 1 SAMPLING SCHEDULES. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5 AT BOTH SITES), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A, 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 14420 BOWMAN DUAL AUGUST
02-A 4500 E. TROTTER DUAL AUGUST
|