THE STAGE 2 ROUTINE SUMMARY SHEETS AND MAP WERE APPROVED ON 5/25/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, AND STAGE 1 SAMPLING SCHEDULES. STAGE 2 SAMPLES COLLECTED DURING SEPTEMBER (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5 AT BOTH SITES), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A,02-A), DURING THE MONTH OF SEPTEMBER.
|