THE STAGE 2 REDUCED SUMMARY SHEET (PROVIDED FOR YOU) AND MAP WERE APPROVED ON 5/19/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2005-2013, 40/30 CERTIFICATION, AND STAGE 1 REDUCED MONITORING SCHEDULE. THIS SYSTEM MET THE REQUIREMENTS TO CONTINUE ON REDUCED MONITORING FROM STAGE 1 TO STAGE 2; HOWEVER, ADEQ DID NOT NOTIFY THE PWS OF THE APPROVAL AND CHANGE IN MONITORING FREQUENCY (FROM TRIENNIAL UNDER STAGE 1 TO ANNUAL UNDER STAGE 2) UNTIL 2016. AS A RESULT, NO VIOLATION WILL BE ASSESSED FOR FAILING TO MONITOR IN 2014 AND THE STAGE 2 MONITORING SCHEDULE WILL BEGIN IN 2016.
|