THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAPS WERE APPROVED ON 06/15/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 & 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014 & 2015, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLES, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A FOR TTHM & HAA5) DURING THE MONTH OF JUNE.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 7201 E. SABINO VISTA DR. DUAL (TTHM & HAA5)
02-A 8550 E. HUNTSWOOD PLACE DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLES, COLLECTED ANNUALLY, AT ONE LOCATION (02-A) DURING THE MONTH OF JUNE.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
02-A 8550 E. HUNTSWOOD PLACE DUAL (TTHM & HAA5)
|