THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (WITH EDITS FROM ORIGINAL SUBMITTAL), STAGE 1 DATA IN EXCEL SPREADSHEET, SUMMARY SHEET AND MAP WERE APPROVED ON 6/28/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2005-2013, AND STAGE 2 40/30 CERTIFICATION (APPROVED 3/30/09).
IN 2014 AND 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 70 CAMINO DE TUNDRA ¿ LOT 80 DUAL (TTHM & HAA5)
02-A 2430 CALLE LIBRE ¿ LOT 64 DUAL (TTHM & HAA5)
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 6/28/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014 AND 2015.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 70 CAMINO DE TUNDRA ¿ LOT 80 DUAL (TTHM & HAA5)
|