THE STAGE 2 COMPLIANCE MONITORING PLAN (CMP), REDUCED CMP SUMMARY SHEET AND MAP WERE APPROVED ON 06/06/2016. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 REDUCED MONITORING (GRANTED 10/26/2011), 40/30 CERTIFICATION (GRANTED 10/26/2011), AND STAGE 2 MONITORING RESULTS FOR 2014. THE SAMPLE COLLECTED DURING 2014 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. THE SYSTEM HAS BEEN APPROVED TO STAY ON REDUCED MONITORING 2RT/YR UNDER STAGE 2 STARTING 10/01/2013.
FROM 10/01/2013, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JUNE.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A COLONIAL REAL PARK STUB-OUT DUAL (TTHM & HAA5)
02-A CORTE AMARILLO DUAL (TTHM & HAA5)
DEAR PUBLIC WATER SYSTEM OWNER/OPERATOR,
THE ATTACHED STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 07/17/2018. APPROVAL WAS BASED ON ATTACHED COMPLIANCE MONITORING PLAN, MAP, AND THE JUSTIFICATION OF THE NEW SITES BELOW.
BEGINNING IN 2018, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE, COLLECTED ANNUALLY, AT TWO LOCATION (02-A AND 04-A), DURING THE MONTH OF JUNE. THE SAMPLES SUBMITTED ON 07/05/2018 HAVE BEEN ACCEPTED.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
02-A CORTE AMARILLO DUAL (TTHM & HAA5)
04-A JOSEPHINE SADDLE DUAL (TTHM & HAA5)
|