THE ATTACHED STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 06/08/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 SAMPLING SCHEDULE, AND STAGE 2 MONITORING RESULTS FROM 2014-2016. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 (JANUARY, APRIL, JULY, AND OCTOBER), 2015 (JUNE, SEPTEMBER, AND DECEMBER), AND 2016 (MARCH) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
FROM 10/01/2013 TO 12/31/2014, STAGE 2 MONITORING CONSISTED OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED QUARTERLY, AT FOUR LOCATIONS (01-A, 02-A, 03-A, AND 04-A), DURING THE MONTHS OF JANUARY, APRIL, JULY AND OCTOBER.
BEGINNING IN 2015, STAGE 2 MONITORING CONSISTS OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED QUARTERLY, AT FOUR LOCATIONS (01-A, 02-A, 03-A, AND 04-A), DURING THE MONTHS OF MARCH, JUNE, SEPTEMBER AND DECEMBER.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 2541 E. LOMAS DR. DUAL (TTHM & HAA5)
02-A 340 N. CALLE RINCONADO DUAL (TTHM & HAA5)
03-A 3400 E. ANDRADA RD. DUAL (TTHM & HAA5)
04-A 2591 E. ROSLYN LN DUAL (TTHM & HAA5)
|