THE STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 5/25/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2008, 2009, 2010, 2011, AND 2013 (PRE-2008 SAMPLE DATA CONSISTED OF MAINLY DIFFERENT WELLS SUPPLYING THE SYSTEM).
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A & 02-A), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 10595 W. ANTHONY DUAL (TTHM & HAA5)
02-A 6502 N. TAYLOR DUAL (TTHM & HAA5)
|