ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0410003

Federal Type:

C

Water System Name:

ARIZONA WATER CO - AJO

Primary Source:

GWP

Principal County Served:

PIMA

System Status:

A

Comments:

Activity Date:

01-01-1955




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET, AND MAP WERE APPROVED ON 06/08/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S 40/30, COMPLIANCE MONITORING PLAN, COMPLIANCE MONITORING PLAN SUMMARY SHEET, STAGE 1 DATA AND MAP. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. BEGINNING IN 2014, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 2 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A, 02-A), DURING THE MONTH OF AUGUST. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES: SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A 2561 N. AJO (GILA BEND HIGHWAY) DUAL (TTHM & HAA5) 02-A 731 N. LYONS AVENUE DUAL (TTHM & HAA5)


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013