BEGINNING IN 2015, STAGE 2 REDUCED MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF SEPTEMBER.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF SEPTEMBER.
YOUR NEXT SAMPLE WILL BE TAKEN IN SEPTEMBER OF 2016.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 833 DREAMY DRAW DUAL (TTHM & HAA5)
|