THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (CMP), CMP SUMMARY SHEET AND MAP WERE APPROVED ON 06/10/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 1 REDUCED MONITORING (GRANTED 07/18/2007), AND STAGE 2 VERY SMALL SYSTEM WAIVER (GRANTED 01/14/2013). SINCE ADEQ DID NOT NOTIFY THE PWS OF THE APPROVAL AND CHANGE IN MONITORING FREQUENCY (FROM TRIENNIAL UNDER STAGE 1 TO ANNUAL UNDER STAGE 2) UNTIL 2016, NO VIOLATION WILL BE ASSESSED FOR FAILING TO MONITOR IN 2014 AND 2015 AND THE STAGE 2 MONITORING SCHEDULE WILL BEGIN IN 2016. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING JUNE 2016 WILL BE CREDITED TO THE SYSTEM ONCE RECEIVED.
BEGINNING IN 2016, STAGE 2 MONITORING CONSISTS OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JUNE.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A KITCHEN AT CAMP PONDEROSA DUAL (TTHM & HAA5)
|