THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 5/23/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2011. STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED 6/3/09) AND STAGE 1 REDUCED MONITORING SAMPLING SCHEDULE (APPROVED 9/2/05 FOR REDUCED, AND THEN THE FREQUENCY WAS ADJUSTED TO ROUTINE WHEN THE SYSTEM CROSSED THE 10,000 THRESHOLD). STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING WILL CONSIST OF INDIVIDUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A FOR TTHM AND 02-A FOR HAA5), DURING THE MONTH OF JULY.
IN 2015, STAGE 2 MONITORING WILL CONSIST OF INDIVIDUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A TTHM IN AUGUST, AND 02-A IN JULY).
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF INDIVIDUAL SAMPLE SETS, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A FOR TTHM AND 02-A FOR HAA5), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A PROSPERITY DR. TTHM
02-A SANTA FE DR. HAA5
|