THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/25/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED ON 5/27/09), AND STAGE 1 MONITORING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING SEPTEMBER 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014-2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT FIVE LOCATIONS (01-A THROUGH 05-A), DURING THE MONTH OF SEPTEMBER.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A BRIDAL PATH & BUCKING HORSE DUAL (TTHM & HAA5)
02-A HIAWATHA & COUNTRY CLUB DUAL (TTHM & HAA5)
03-A STORAGE TANK WELL 2 DUAL (TTHM & HAA5)
04-A WHITE OAK & ELK DUAL (TTHM & HAA5)
05-A STORAGE TANK WELL 1 DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A BRIDAL PATH & BUCKING HORSE DUAL (TTHM & HAA5)
02-A HIAWATHA & COUNTRY CLUB DUAL (TTHM & HAA5)
|