THE STAGE 2 REDUCED MONITORING SUMMARY SHEET AND MAP WERE APPROVED ON 06/06/16. THE APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED ON 06/04/2009), AND STAGE 1 DBP REDUCED MONITORING (GRANTED ON 11/08/2007).
STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE, COLLECTED TRIENNIALLY, AT ONE LOCATION, DURING THE MONTH OF JULY, BEGINNING IN 2014. YOUR NEXT SAMPLE SHOULD BE TAKEN IN JULY 2016. IF THE SYSTEM¿S POPULATION INCREASES TO SERVE 500 PEOPLE OR MORE, THEN THE MONITORING FREQUENCY WOULD AUTOMATICALLY MOVE FROM TRIENNIAL TO ANNUAL MONITORING.
|