ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0408122

Federal Type:

C

Water System Name:

HORIZON SIX DWID

Primary Source:

GWP

Principal County Served:

MOHAVE

System Status:

A

Comments:

Activity Date:

02-11-1991




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN (IDSE REPORT) AND MAPS WERE APPROVED ON 6/26/13. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, AND THE STAGE 2 IDSE STANDARD MONITORING AND IDSE REPORT WHICH WERE REVIEWED AND APPROVED ON 11/15/11. SINCE THE SYSTEM HAS NOT SUBMITTED THE REQUIRED STAGE 2 SUMMARY SHEET, IN ORDER TO ENTER THE STAGE 2 SAMPLING DATA THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY HAS ESTABLISHED THE MONITORING SCHEDULES CONTAINED BELOW: 1) DURING THE MONTH OF JULY 2014, STAGE 2 ROUTINE MONITORING WILL CONSIST OF INDIVIDUAL SAMPLES, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A). DUE TO AN MCL TRIGGER IN JULY 2014 THE SYSTEM WENT TO INCREASED MONITORING BEGINNING IN THE 4Q14; HOWEVER, NO SAMPLES WERE COLLECTED IN THE 4Q14 AND 1Q15, AND THE SYSTEM CONTINUED TO COLLECT INDIVIDUAL SAMPLES THROUGH THE 4Q15 INSTEAD OF DUAL SAMPLES. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A 1061 RED ROCK RD TTHM ONLY 02-A 4035 LITTLE FINGER RD HAA5 ONLY 2) BEGINNING IN THE 4Q14 THROUGH THE 4Q15, STAGE 2 MONITORING WILL CONSIST OF INDIVIDUAL SAMPLES, COLLECTED QUARTERLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTHS OF JANUARY, APRIL, JULY AND OCTOBER. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A 1061 RED ROCK RD TTHM ONLY 02-A 4035 LITTLE FINGER RD HAA5 ONLY 3) BEGINNING IN THE 1Q16, STAGE 2 INCREASED MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED QUARTERLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTHS OF JANUARY, APRIL, JULY AND OCTOBER. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013