THE STAGE 2 REDUCED MONITORING SUMMARY SHEET AND MAP (RECEIVED 10/08/2015) HAS MET ALL THE REQUIREMENTS AND HAS BEEN APPROVED ON JULY 7TH, 2016.
STAGE 2 REDUCED MONITORING WILL CONSIST OF INDIVIDUAL SAMPLES, COLLECTED ANNUALLY, AT TWO LOCATIONS (01-B AND 02-B), DURING THE MONTH OF AUGUST, BEGINNING IN 2016.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH BOTH THE SITE ID (RENAMED TO 01-B AND 02-B) AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID
01-B ANDALUSION (SAMPLING STATION #3) INDIVIDUAL (TTHM)
02-B CARR CANYON (SAMPLING STATION #4) INDIVIDUAL (HAA5)
|