THE STAGE 2 INCREASED COMPLIANCE MONITORING PLAN(WITH EDITS), SUMMARY SHEET (WITH EDITS), AND MAP WERE APPROVED ON 06/02/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S REVISED COMPLIANCE MONITORING PLAN. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) STARTING DECEMBER 2013 THROUGH MARCH 2016 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN DECEMBER 2013, STAGE 2 INCREASED MONITORING WILL CONSIST OF 2 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED EVERY 90 DAYS(+/-2), 3RD MONTH OF EACH QUARTER (MARCH, JUNE, SEPTEMBER, DECEMBER), AT TWO LOCATIONS (01-A, 02-A).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 8631 ASH ST. DUAL (TTHM & HAA5)
02-A 1104 LAUREL LANE DUAL (TTHM & HAA5)
|