THE ATTACHED STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 5/20/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE). STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
SITE 01-A HAS BEEN CHANGED TO 3661 W. ABRIGO DR.
THE ATTACHED COMPLIANCE MONITORING PLAN, SUMMARY SHEET, AND MAP HAVE BEEN APPROVED.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 3661 W. ABRIGO DR. DUAL (TTHM & HAA5)
02-A 5636 W. WILCOX DR. DUAL (TTHM & HAA5)
|